JANGAN BERHENTI PADA KATA “TLA”, “KABEL”, “TRAFO” DAN “BAY”
POWER GENERATION, TRANSMISSION CABLE & EQUIPMENT
SECTORAL REVIEW & TENDER ACADEMY — 4 SEPTEMBER 2026
Judul tender hanya memberikan project signal. Business intelligence sebenarnya berada pada detail sistem dan equipment di bawahnya. Untuk menghasilkan supplier, OEM dan contractor matching yang akurat, retrieval harus diturunkan hingga:
TENDER TITLE ↓ PROJECT OWNER / END USER ↓ PROJECT LOCATION ↓ EXISTING SYSTEM ↓ VOLTAGE LEVEL ↓ SYSTEM ARCHITECTURE / SLD ↓ EXISTING OEM / BRAND ↓ EQUIPMENT TYPE ↓ MODEL / RATING / CAPACITY ↓ PROBLEM / REPLACEMENT REASON ↓ SCOPE OF WORK ↓ BOQ & QUANTITY ↓ TECHNICAL SPECIFICATION ↓ INTERFACE REQUIREMENT ↓ INSTALLATION METHOD ↓ TESTING & COMMISSIONING ↓ OEM / SUPPLIER / CONTRACTOR MATCHING
RETRIEVAL PRIORITY
SUTT: TLA definition, type, rating, quantity & installation point GIS: Cable type, size, length, joint, sealing end & existing GIS OEM Transformer: Capacity, voltage ratio, impedance, cooling & existing OEM Bay: Configuration, breaker, CT/PT, disconnector, protection & control
Tanpa BOQ, SLD, datasheet dan technical specification, vendor matching masih berada pada level preliminary intelligence.