ELECTRICITY EQUIPMENT & LIGHTNING ARRESTER Tanggal: 3 September 2026
Terdapat Retender Kabel Power Generator Unit 1–4 PLTA Mendalan.
Tender memberikan signal kebutuhan power cable untuk fasilitas pembangkit listrik tenaga air.
Business opportunity mengarah kepada cable manufacturer, authorized distributor, electrical contractor, cable termination/jointing specialist serta testing provider.
Data utama yang perlu ditelusuri adalah voltage rating, conductor size, material, number of cores, insulation, cable length, termination, accessories dan required standard.
RAG AI
Knowledge ID: TA-ELECTRICAL-20260903 Demand: Generator Power Cable Technology: Power Distribution Cable Product: Power Cable / Cable Accessories Retrieval Priority: Cable Schedule / Datasheet / Technical Specification