PROYEK MIGAS
Spesifikasi Pekerjaan EPCC
1. Engineering, Design, Procurement, Fabrication, Transportation and installation of four (4) New Offshore Well Head Platforms completed with TRIAS Jacket and its appurtenances (Conductor pile, Boat landing, preinstalled 8” riser and V-Shape boat landing)
• WPS4 & WPS5 : 3 slots 6 wells
• WPN6 & WPN7 : 3 slots 6 wells
• WPN5 & WPN8 : 3 slots 6 wells (2 CPs and 3 flow lines)
• WPN6 : 3 slots 6 wells
• WPN7 : 3 slots 6 wells
• WPN8 : 3 slots 6 wells (2 CPs and 3 flow lines)
• WPN6 & WPN7 : 3 slots 6 wells
• WPN5 & WPN8 : 3 slots 6 wells (2 CPs and 3 flow lines)
• WPN6 : 3 slots 6 wells
• WPN7 : 3 slots 6 wells
• WPN8 : 3 slots 6 wells (2 CPs and 3 flow lines)
2. Engineering, design, procurement, Fabrication, load out and sea fastening of 2 (two) New TRIAS Jacket and its appurtenances (pre-installed 8” riser and V-Shape boatlanding),
• WPN7 and WPN8 (T&I by EPSCC -A)
3. (six) New Pipeline 8” from new platform to existing host platform including riser and expansion loop installation at existing host platform.
4. Including Pre Commissioning and Commissioning
5. Transportation and Installation of two (2) New TRIAS Jacket (Fabrication by EPSCC-B)
• WPN7 and WPN8
6. Modification work at existing facilities:
• MWPS and MWPN (offshore)
• CPU, NPU, SPU and SNPS (onshore)
• WPN3 (offshore)
• CPU, NPU, SPU and SNPS (onshore)
• WPN3 (offshore)
7. Engineering, Design, Procurement, Fabrication, Transportation and installation of two (2) New Offshore Well Head Platforms (Topside) completed with its appurtenances (Conductor pile and Boat landing)
• WPN7 : 3 slots 6 wells
• WPN8 : 3 slots 6 wells (2 CPs and 3 flow lines)
• WPN8 : 3 slots 6 wells (2 CPs and 3 flow lines)