- Agro & Fishery
- Air Navigation & Airport Facility
- Air Transportation & Maintenance
- Automation & Instrumentation
- Chemical & Industrial Gas
- Civil Work
- Computer & IT
- Construction Material
- Conveyor
- Dredging
- Drilling & Workover Well Service
- Electricity Equipment & Lightning Arrester
- Elevator, Eskalator & Travelator
- Engineering Consultant (Construction)
- EPC (Engineering Procurement Construction)
- Fabrication & Mechanical Construction
- Heavy Equipment
- HSE (Health, Safety, & Environtmental)
- Industrial Machine
- Laboratory
- Lighting
- Logistic Service
- Lubricant & Grease
- Man Power Supply
- Marine Contractor & Underwater Work
- Marine Transportation
- Mechanical & Electrical Repair
- Medical Equipment & Medicine
- Mining Service
- Non Engineering Consultant
- Oil & Gas Production
- Others
- Overhead Crane
- Pipe, Valve, Casing, Tubing, & Hose
- Plant Maintenance, Repair, & Operation
- Police & Military Equipment
- Power Generation, Transmission Cable & Equipment
- Property & Facility Maintenance
- Property Construction
- Pump
- Railway & Train
- Sea Port & Sea Navigation Equipment
- Seismic, Geotechnic, & Geophysics
- Shipyard
- Survey & Inspection
- Telecommunication
- Vehicle, Bus, & Truck
- Water, Waste Water, & Solid Waste Treatment
Belanja Modal Satyamitra Kemas Lestari (SMKL)
Project Owner : PT Satyamitra Kemas Lestari Tbk (SMKL)
Description : Emiten kemasan, PT Satyamitra Kemas Lestari Tbk (SMKL) menyiapkan dana investasi sebesar Rp 600 miliar-Rp 700 miliar untuk membangun pabrik kemasan baru yang berlokasi di Jawa Tengah. Sampai saat ini proses pembebasan lahan seluas kurang lebih 24 hektar telah selesai dilakukan. Pada Agustus mendatang proses ground breaking sudah mulai berjalan, sehingga diharapkan pada akhir 2023 nanti perusahaan sudah mulai bisa melakukan trial produksi tahap 1. Setelah pembangunan tahap pertama selesai, nantinya pabrik baru di Jawa Tengah ini akan memiliki dua line produksi dengan total kapasitas kurang lebih mencapai 7.000 ton per bulan.
Project Value : Rp 700 miliar
Project Schedule : 2022
Untuk info detail hanya dapat diakses member (Hub Eka +62 813-1576-9018)
***gambar adalah hanya untuk keperluan ilustrasi