- Agro & Fishery
- Air Navigation & Airport Facility
- Air Transportation & Maintenance
- Automation & Instrumentation
- Chemical & Industrial Gas
- Civil Work
- Computer & IT
- Construction Material
- Conveyor
- Dredging
- Drilling & Workover Well Service
- Electricity Equipment & Lightning Arrester
- Elevator, Eskalator & Travelator
- Engineering Consultant (Construction)
- EPC (Engineering Procurement Construction)
- Fabrication & Mechanical Construction
- Heavy Equipment
- HSE (Health, Safety, & Environtmental)
- Industrial Machine
- Laboratory
- Lighting
- Logistic Service
- Lubricant & Grease
- Man Power Supply
- Marine Contractor & Underwater Work
- Marine Transportation
- Mechanical & Electrical Repair
- Medical Equipment & Medicine
- Mining Service
- Non Engineering Consultant
- Oil & Gas Production
- Others
- Overhead Crane
- Pipe, Valve, Casing, Tubing, & Hose
- Plant Maintenance, Repair, & Operation
- Police & Military Equipment
- Power Generation, Transmission Cable & Equipment
- Property & Facility Maintenance
- Property Construction
- Pump
- Railway & Train
- Sea Port & Sea Navigation Equipment
- Seismic, Geotechnic, & Geophysics
- Shipyard
- Survey & Inspection
- Telecommunication
- Vehicle, Bus, & Truck
- Water, Waste Water, & Solid Waste Treatment
PROJECT ROOM
Tender Pembangunan Gedung Kantor Pengadilan Tinggi Tata Usaha Negara Mataram TA. 2025.
Sektor : Infrastructure
Tender Proyek Mahkamah Agung RI berupa Pembangunan Gedung Kantor Pengadilan Tinggi Tata Usaha Negara Mataram TA. 2025 di DKI Jakarta Rp 30,6 miliar.
Untuk info detail hanya dapat diakses member (Hub Linagie +62 813-1576-9018)
***gambar adalah hanya untuk keperluan ilustrasi