- Agro & Fishery
- Air Navigation & Airport Facility
- Air Transportation & Maintenance
- Automation & Instrumentation
- Chemical & Industrial Gas
- Civil Work
- Computer & IT
- Construction Material
- Conveyor
- Dredging
- Drilling & Workover Well Service
- Electricity Equipment & Lightning Arrester
- Elevator, Eskalator & Travelator
- Engineering Consultant (Construction)
- EPC (Engineering Procurement Construction)
- Fabrication & Mechanical Construction
- Heavy Equipment
- HSE (Health, Safety, & Environtmental)
- Industrial Machine
- Laboratory
- Lighting
- Logistic Service
- Lubricant & Grease
- Man Power Supply
- Marine Contractor & Underwater Work
- Marine Transportation
- Mechanical & Electrical Repair
- Medical Equipment & Medicine
- Mining Service
- Non Engineering Consultant
- Oil & Gas Production
- Others
- Overhead Crane
- Pipe, Valve, Casing, Tubing, & Hose
- Plant Maintenance, Repair, & Operation
- Police & Military Equipment
- Power Generation, Transmission Cable & Equipment
- Property & Facility Maintenance
- Property Construction
- Pump
- Railway & Train
- Sea Port & Sea Navigation Equipment
- Seismic, Geotechnic, & Geophysics
- Shipyard
- Survey & Inspection
- Telecommunication
- Vehicle, Bus, & Truck
- Water, Waste Water, & Solid Waste Treatment
Proyek Pembangunan PLTS di Tihi-Tihi dan Selangan
Project Owner : Pemerintah
Description : Pembangunan Pembangkit Listrik Tenaga Surya (PLTS) bakal kembali dilakukan. Kali ini menyasar wilayah Tihi-Tihi dan Selangan. Proses lelang akan segera dilakukan. Pembangunan PLTS tersebut menjadi salah satu prioritas, di samping peningkatan infrastruktur lingkungan lainnya.
Alokasi anggaran yang disiapkan untuk dua lokasi itu sekitar Rp 12 miliar. Sementara PLTS yang akan dibangun memiliki daya 15 dan 30 kilowatt peak (kwp).
Project Value : Rp 12 miliar
Project Schedule : 2024
Untuk info detail hanya dapat diakses member (Hub Linagie +62 813-1576-9018)
***gambar adalah hanya untuk keperluan ilustrasi