- Agro & Fishery
- Air Navigation & Airport Facility
- Air Transportation & Maintenance
- Automation & Instrumentation
- Chemical & Industrial Gas
- Civil Work
- Computer & IT
- Construction Material
- Conveyor
- Dredging
- Drilling & Workover Well Service
- Electricity Equipment & Lightning Arrester
- Elevator, Eskalator & Travelator
- Engineering Consultant (Construction)
- EPC (Engineering Procurement Construction)
- Fabrication & Mechanical Construction
- Heavy Equipment
- HSE (Health, Safety, & Environtmental)
- Industrial Machine
- Laboratory
- Lighting
- Logistic Service
- Lubricant & Grease
- Man Power Supply
- Marine Contractor & Underwater Work
- Marine Transportation
- Mechanical & Electrical Repair
- Medical Equipment & Medicine
- Mining Service
- Non Engineering Consultant
- Oil & Gas Production
- Others
- Overhead Crane
- Pipe, Valve, Casing, Tubing, & Hose
- Plant Maintenance, Repair, & Operation
- Police & Military Equipment
- Power Generation, Transmission Cable & Equipment
- Property & Facility Maintenance
- Property Construction
- Pump
- Railway & Train
- Sea Port & Sea Navigation Equipment
- Seismic, Geotechnic, & Geophysics
- Shipyard
- Survey & Inspection
- Telecommunication
- Vehicle, Bus, & Truck
- Water, Waste Water, & Solid Waste Treatment
Belanja Modal Blue Bird (BIRD) Tahun 2024
Project Owner : PT Blue Bird Tbk (BIRD)
Description : Pada tahun 2024, PT Blue Bird Tbk (BIRD) menyiapkan anggaran belanja modal atau capex senilai Rp 2 triliun hingga Rp 2,5 triliun. Dana ini akan digunakan untuk beberapa proyek strategis, penambahan serta peremajaan armada dan layanan bagi perseroan.
Terkait penambahan unit taksi, Andre mengatakan perseroan tahun ini berencana melakukan pembelian dan peremajaan sebanyak total 7.000 unit armada. Terdiri dari taksi, non-taksi seperti bus, shuttle, dan mobil rental maupun EV.
Project Value : Rp 2,5 triliun
Project Schedule : 2024
Untuk info detail hanya dapat diakses member (Hub Linagie +62 813-1576-9018)
***gambar adalah hanya untuk keperluan ilustrasi