- Agro & Fishery
- Air Navigation & Airport Facility
- Air Transportation & Maintenance
- Automation & Instrumentation
- Chemical & Industrial Gas
- Civil Work
- Computer & IT
- Construction Material
- Conveyor
- Dredging
- Drilling & Workover Well Service
- Electricity Equipment & Lightning Arrester
- Elevator, Eskalator & Travelator
- Engineering Consultant (Construction)
- EPC (Engineering Procurement Construction)
- Fabrication & Mechanical Construction
- Heavy Equipment
- HSE (Health, Safety, & Environtmental)
- Industrial Machine
- Laboratory
- Lighting
- Logistic Service
- Lubricant & Grease
- Man Power Supply
- Marine Contractor & Underwater Work
- Marine Transportation
- Mechanical & Electrical Repair
- Medical Equipment & Medicine
- Mining Service
- Non Engineering Consultant
- Oil & Gas Production
- Others
- Overhead Crane
- Pipe, Valve, Casing, Tubing, & Hose
- Plant Maintenance, Repair, & Operation
- Police & Military Equipment
- Power Generation, Transmission Cable & Equipment
- Property & Facility Maintenance
- Property Construction
- Pump
- Railway & Train
- Sea Port & Sea Navigation Equipment
- Seismic, Geotechnic, & Geophysics
- Shipyard
- Survey & Inspection
- Telecommunication
- Vehicle, Bus, & Truck
- Water, Waste Water, & Solid Waste Treatment
Proyek Pembangunan Jalan Arteri Batu Ampar - Batu Besar
Project Owner : Pemerintah
Description : Kepala Badan Pengusahaan (BP) Batam melakukan peninjauan progres pembangunan dan peningkatan ruas jalan arteri yang menghubungkan Batu Ampar hingga Batu Besar, Nongsa.
Setelah melakukan pengukuran langsung dengan alat Total Station, seluruh pembangunan yang dimulai sejak 5 Januari 2023 itu telah sesuai dengan rencana. Pembangunan jalan ini tidak menemui kendala hingga bisa selesai tepat waktu pada 31 Desember 2023 mendatang.
Project Value : -
Project Schedule : 2023
Untuk info detail hanya dapat diakses member (Hub Linagie +62 813-1576-9018)
***gambar adalah hanya untuk keperluan ilustrasi