- Agro & Fishery
- Air Navigation & Airport Facility
- Air Transportation & Maintenance
- Automation & Instrumentation
- Chemical & Industrial Gas
- Civil Work
- Computer & IT
- Construction Material
- Conveyor
- Dredging
- Drilling & Workover Well Service
- Electricity Equipment & Lightning Arrester
- Elevator, Eskalator & Travelator
- Engineering Consultant (Construction)
- EPC (Engineering Procurement Construction)
- Fabrication & Mechanical Construction
- Heavy Equipment
- HSE (Health, Safety, & Environtmental)
- Industrial Machine
- Laboratory
- Lighting
- Logistic Service
- Lubricant & Grease
- Man Power Supply
- Marine Contractor & Underwater Work
- Marine Transportation
- Mechanical & Electrical Repair
- Medical Equipment & Medicine
- Mining Service
- Non Engineering Consultant
- Oil & Gas Production
- Others
- Overhead Crane
- Pipe, Valve, Casing, Tubing, & Hose
- Plant Maintenance, Repair, & Operation
- Police & Military Equipment
- Power Generation, Transmission Cable & Equipment
- Property & Facility Maintenance
- Property Construction
- Pump
- Railway & Train
- Sea Port & Sea Navigation Equipment
- Seismic, Geotechnic, & Geophysics
- Shipyard
- Survey & Inspection
- Telecommunication
- Vehicle, Bus, & Truck
- Water, Waste Water, & Solid Waste Treatment
Belanja Modal Intraco Penta (INTA) Tahun 2023
Project Owner : PT Intraco Penta Tbk (INTA)
Description : PT Intraco Penta Tbk (INTA) mengalokasikan belanja modal mencapai Rp 84 miliar untuk tahun 2023. Sebagian besar dana belanja modal digunakan untuk pembelian alat berat.
Hingga tutup tahun 2022 perusahaan memperkirakan penjualan mencapai Rp 643 miliar. Sektor tambang khususnya batubara dan nikel jadi penopang utama penjualan alat berat oleh INTA untuk tahun 2022.
Project Value : Rp 84 miliar
Project Schedule : 2023
Untuk info detail hanya dapat diakses member (Hub Sita +62 813-1576-9018)
***gambar adalah hanya untuk keperluan ilustrasi