- Agro & Fishery
- Air Navigation & Airport Facility
- Air Transportation & Maintenance
- Automation & Instrumentation
- Chemical & Industrial Gas
- Civil Work
- Computer & IT
- Construction Material
- Conveyor
- Dredging
- Drilling & Workover Well Service
- Electricity Equipment & Lightning Arrester
- Elevator, Eskalator & Travelator
- Engineering Consultant (Construction)
- EPC (Engineering Procurement Construction)
- Fabrication & Mechanical Construction
- Heavy Equipment
- HSE (Health, Safety, & Environtmental)
- Industrial Machine
- Laboratory
- Lighting
- Logistic Service
- Lubricant & Grease
- Man Power Supply
- Marine Contractor & Underwater Work
- Marine Transportation
- Mechanical & Electrical Repair
- Medical Equipment & Medicine
- Mining Service
- Non Engineering Consultant
- Oil & Gas Production
- Others
- Overhead Crane
- Pipe, Valve, Casing, Tubing, & Hose
- Plant Maintenance, Repair, & Operation
- Police & Military Equipment
- Power Generation, Transmission Cable & Equipment
- Property & Facility Maintenance
- Property Construction
- Pump
- Railway & Train
- Sea Port & Sea Navigation Equipment
- Seismic, Geotechnic, & Geophysics
- Shipyard
- Survey & Inspection
- Telecommunication
- Vehicle, Bus, & Truck
- Water, Waste Water, & Solid Waste Treatment
Proyek Pembangunan Pasca-bencana Kawasan Huntap Talise di Palu
Project Owner : Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR)
Description : Kementerian PUPR memulai pembangunan infrastruktur permukiman kawasan Hunian Tetap (Huntap) Talise di Kota Palu, Sulawesi Tengah (Sulteng). Kementerian PUPR berkolaborasi dalam membangun Huntap relokasi dan infrastruktur permukimannya dalam tiga kategori, yaitu skala besar (kawasan), satelit, dan mandiri. Pembangunan kawasan Huntap Talise lingkup pekerjaannya berupa pembangunan jalan dan drainase lingkungan, Sistem Penyediaan Air Minum (SPAM). Kemudian, Sistem Pengolahan Air Limbah Domestik Terpusat (SPALDT), dan infrastuktur persampahan serta Ruang Terbuka Hijau (RTH). Kementerian PUPR telah membangun 1.679 unit Huntap di Sulawesi Tengah dan akan dilanjutkan pembangunannya sebanyak 4.089 unit yang salah satunya berada di Talise. Adapun Huntap Talise direncanakan akan menampung 599 unit rumah.
Project Value : -
Project Schedule : 2022
Untuk info detail hanya dapat diakses member (Hub Sita +62 813-1576-9018)
***gambar adalah hanya untuk keperluan ilustrasi