- Agro & Fishery
- Air Navigation & Airport Facility
- Air Transportation & Maintenance
- Automation & Instrumentation
- Chemical & Industrial Gas
- Civil Work
- Computer & IT
- Construction Material
- Conveyor
- Dredging
- Drilling & Workover Well Service
- Electricity Equipment & Lightning Arrester
- Elevator, Eskalator & Travelator
- Engineering Consultant (Construction)
- EPC (Engineering Procurement Construction)
- Fabrication & Mechanical Construction
- Heavy Equipment
- HSE (Health, Safety, & Environtmental)
- Industrial Machine
- Laboratory
- Lighting
- Logistic Service
- Lubricant & Grease
- Man Power Supply
- Marine Contractor & Underwater Work
- Marine Transportation
- Mechanical & Electrical Repair
- Medical Equipment & Medicine
- Mining Service
- Non Engineering Consultant
- Oil & Gas Production
- Others
- Overhead Crane
- Pipe, Valve, Casing, Tubing, & Hose
- Plant Maintenance, Repair, & Operation
- Police & Military Equipment
- Power Generation, Transmission Cable & Equipment
- Property & Facility Maintenance
- Property Construction
- Pump
- Railway & Train
- Sea Port & Sea Navigation Equipment
- Seismic, Geotechnic, & Geophysics
- Shipyard
- Survey & Inspection
- Telecommunication
- Vehicle, Bus, & Truck
- Water, Waste Water, & Solid Waste Treatment
Belanja Modal Pinago Utama (PNGO)
Project Owner : PT Pinago Utama Tbk (PNGO)
Description : Emiten sawit, PT Pinago Utama Tbk (PNGO), berencana melakukan replanting serta pengembangan terhadap area perkebunan sawit dan karet di sepanjang tahun ini. Perseroan menargetkan replanting dan pengembangan area sawit seluas 1,691 hektar dan area karet seluas 126 hektar. Untuk memaksimalkan rencana tersebut, Pinago Utama menyiapkan dana belanja modal atau capital expenditure (Capex) sebesar Rp 142 miliar di sepanjang tahun ini
Project Value : Rp 142 miliar
Project Schedule : 2022
Untuk info detail aneka tender proyek, silahkan daftar membership di www.Tender-Indonesia.com/registrasi (Hub Eka +62 813-1576-9018)
***gambar adalah hanya untuk keperluan ilustrasi