- Agro & Fishery
- Air Navigation & Airport Facility
- Air Transportation & Maintenance
- Automation & Instrumentation
- Chemical & Industrial Gas
- Civil Work
- Computer & IT
- Construction Material
- Conveyor
- Dredging
- Drilling & Workover Well Service
- Electricity Equipment & Lightning Arrester
- Elevator, Eskalator & Travelator
- Engineering Consultant (Construction)
- EPC (Engineering Procurement Construction)
- Fabrication & Mechanical Construction
- Heavy Equipment
- HSE (Health, Safety, & Environtmental)
- Industrial Machine
- Laboratory
- Lighting
- Logistic Service
- Lubricant & Grease
- Man Power Supply
- Marine Contractor & Underwater Work
- Marine Transportation
- Mechanical & Electrical Repair
- Medical Equipment & Medicine
- Mining Service
- Non Engineering Consultant
- Oil & Gas Production
- Others
- Overhead Crane
- Pipe, Valve, Casing, Tubing, & Hose
- Plant Maintenance, Repair, & Operation
- Police & Military Equipment
- Power Generation, Transmission Cable & Equipment
- Property & Facility Maintenance
- Property Construction
- Pump
- Railway & Train
- Sea Port & Sea Navigation Equipment
- Seismic, Geotechnic, & Geophysics
- Shipyard
- Survey & Inspection
- Telecommunication
- Vehicle, Bus, & Truck
- Water, Waste Water, & Solid Waste Treatment
Proyek Pembangunan PLTS Apung Berkapasitas 42 MWp di Batam
Project Owner : PT Perusahaan Listrik Negara (PLN)
Description : PT Perusahaan Listrik Negara (PLN) berencana membangun Pembangkit Listrik Tenaga Surya (PLTS) Apung berkapasitas 42 megawatt peak (MWp) untuk mendukung pertumbuhan ekonomi dan industri di Batam, Kepulauan Riau.
Proyek ini diinisiasi dengan penandatangan nota kesepahaman (MoU) antara PT PLN Batam, PT PLN Nusantara Power dan PT Energi Baru TBS tentang rencana studi kerja sama potensi, pengembangan, pembangunan, kepemilikan, dan pengoperasian proyek pembangkit listrik tenaga surya (PLTS) terapung di Indonesia.
Dengan kapasitas 42 MWp, total investasi yang akan dikeluarkan oleh TBS diperkirakan mencapai US$ 50 juta dan diharapkan mulai beroperasi pada tahun 2024.
Project Value : US$ 50 juta
Project Schedule : 2023 s/d 2024
Untuk info detail hanya dapat diakses member (Hub Linagie +62 813-1576-9018)