- Agro & Fishery
- Air Navigation & Airport Facility
- Air Transportation & Maintenance
- Automation & Instrumentation
- Chemical & Industrial Gas
- Civil Work
- Computer & IT
- Construction Material
- Conveyor
- Dredging
- Drilling & Workover Well Service
- Electricity Equipment & Lightning Arrester
- Elevator, Eskalator & Travelator
- Engineering Consultant (Construction)
- EPC (Engineering Procurement Construction)
- Fabrication & Mechanical Construction
- Heavy Equipment
- HSE (Health, Safety, & Environtmental)
- Industrial Machine
- Laboratory
- Lighting
- Logistic Service
- Lubricant & Grease
- Man Power Supply
- Marine Contractor & Underwater Work
- Marine Transportation
- Mechanical & Electrical Repair
- Medical Equipment & Medicine
- Mining Service
- Non Engineering Consultant
- Oil & Gas Production
- Others
- Overhead Crane
- Pipe, Valve, Casing, Tubing, & Hose
- Plant Maintenance, Repair, & Operation
- Police & Military Equipment
- Power Generation, Transmission Cable & Equipment
- Property & Facility Maintenance
- Property Construction
- Pump
- Railway & Train
- Sea Port & Sea Navigation Equipment
- Seismic, Geotechnic, & Geophysics
- Shipyard
- Survey & Inspection
- Telecommunication
- Vehicle, Bus, & Truck
- Water, Waste Water, & Solid Waste Treatment
Tender Proyek PT. Perkebunan Nusantara III (Persero) berupa :
1. Pengadaan Bersama Pupuk Tunggal Semester II Tahun 2023 Pupuk Mop/Kcl Sebanyak 6.787.100 Kg Kebutuhan PTPN I, II Dan V Rp 74 miliar
2. Pengadaan Bersama Pupuk Tunggal Semester II Tahun 2023 Pupuk Mop/Kcl Sebanyak 7.750.050 Kg Kebutuhan PTPN VII, IX, X, XI, XII Dan XIIIN Rp 91 miliar
3. Pengadaan Bersama Pupuk Tunggal Semester II Tahun 2023 Pupuk Tsp Sebanyak 7.561.700 Kg Kebutuhan PTPN VII Dan XII Rp 90 miliar
4. Pengadaan Bersama Pupuk Tunggal Semester II Tahun 2023 Pupuk Urea Sebanyak 23.752.750 Kg Kebutuhan PT Perkebunan Nusantara III (Persero) Dan Anak Perusahaan PTPN I, II, V Dan VI Rp 220 miliar
5. Pengadaan Bersama Pupuk Tunggal Semester II Tahun 2023 Pupuk Urea Sebanyak 20.551.750 Kg Kebutuhan PTPN VII, III (Kso Djaba), IX, X, XII, XIII Dan XIV Rp 197 miliar
Untuk info detail hanya dapat diakses member (Hub Linagie +62 813-1576-9018)
***gambar adalah hanya untuk keperluan ilustrasi