- Agro & Fishery
- Air Navigation & Airport Facility
- Air Transportation & Maintenance
- Automation & Instrumentation
- Chemical & Industrial Gas
- Civil Work
- Computer & IT
- Construction Material
- Conveyor
- Dredging
- Drilling & Workover Well Service
- Electricity Equipment & Lightning Arrester
- Elevator, Eskalator & Travelator
- Engineering Consultant (Construction)
- EPC (Engineering Procurement Construction)
- Fabrication & Mechanical Construction
- Heavy Equipment
- HSE (Health, Safety, & Environtmental)
- Industrial Machine
- Laboratory
- Lighting
- Logistic Service
- Lubricant & Grease
- Man Power Supply
- Marine Contractor & Underwater Work
- Marine Transportation
- Mechanical & Electrical Repair
- Medical Equipment & Medicine
- Mining Service
- Non Engineering Consultant
- Oil & Gas Production
- Others
- Overhead Crane
- Pipe, Valve, Casing, Tubing, & Hose
- Plant Maintenance, Repair, & Operation
- Police & Military Equipment
- Power Generation, Transmission Cable & Equipment
- Property & Facility Maintenance
- Property Construction
- Pump
- Railway & Train
- Sea Port & Sea Navigation Equipment
- Seismic, Geotechnic, & Geophysics
- Shipyard
- Survey & Inspection
- Telecommunication
- Vehicle, Bus, & Truck
- Water, Waste Water, & Solid Waste Treatment
Proyek Pembangunan Pabrik HPAL di Sorowako Sulsel
Project Owner : PT Vale Indonesia Tbk (INCO) dan Zhejiang Huayou Cobalt Company (Huayou)
Description : Konsorsium PT Vale Indonesia Tbk (INCO)- Zhejiang Huayou Cobalt Company (Huayou) bakal kembali menggarap proyek smelter berteknologi High Pressure Acid Leaching (HPAL) di Sulawesi. Kali ini, proyek smelter teranyar kedua perusahaan tersebut direncanakan berlokasi di Sorowako, Sulawesi Selatan.
Smelter HPAL di Sorowako kelak bakal mengolah limonite atau bijih nikel berkadar rendah dari tambang Vale Indonesia yang berlokasi di Sorowako menjadi Mixed Hydroxide Precipitate (MHP).
Proyek smelter di Sorowako menambah daftar proyek-proyek smelter Vale Indonesia. Seperti diketahui, Vale Indonesia juga tengah mengawal proyek smelter berteknologi rotary kiln-electric furnace (RKEF) dengan rencana kapasitas produksi 73.000-80.000 metrik ton feronikel di Bahodopi, Sulawesi Tengah.
Menurut estimasi, nilai investasi Pabrik HPAL Sorowako direncanakan sekitar US$ 1,8 miliar untuk pembangunan pabrik berikut infrastruktur pendukungnya. Pengerjaan fisik Pabrik HPAL di Sorowako diperkirakan memakan waktu sekitar 3 tahun, sehingga penyelesaiannya diproyeksi di 2025 akhir atau 2026.
Project Value : US$ 1,8 miliar
Project Schedule : 2022 s/d 2026
Untuk info detail hanya dapat diakses member (Hub Sita +62 813-1576-9018)
***gambar adalah hanya untuk keperluan ilustrasi